Vacancy title:
2 Control Room Operators
Jobs at:
Mbeya Cement Company LimitedDeadline of this Job:
Thursday, December 21 2023
Summary
Date Posted: Friday, December 15 2023, Base Salary: Not Disclosed
JOB DETAILS:
Mbeya Cement Company Limited (Lafarge Tanzania) a subsidiary of Holcim Group with its headquarters in Switzerland with operations in Africa, Europe, Asia and America. Holcim is the leading global company in innovative and sustainable building & construction solutions.
Lafarge Tanzania is seeking to recruit highly motivated Control Room Operators, to be based in Mbeya Plant, in a permanent employment contract.
Position Reporting: Kiln Coach
Summary of Roles and Responsibilities
1. Control all major process lines within the cement manufacturing operation including equipment commissioning, starts- ups, shutdowns, and emergency condition management as per established SOP’s in order to meet production requirements;
2. Monitor continuously, all plant process lines using all available tools to ensure employee safety, stable equipment operation, equipment integrity within prescribe design limitations, operating targets, and environmental regulations;
3. Control product quality at all stages of the cement manufacturing process by having a clear understanding of the targets, and the levers that are used to control the targets, along with the appropriate decision making process based on the impact of each lever;
4. Coordinate plant resources to troubleshoot, inspect, and maintain plant equipment as required, to meet production demands and prevent failures;
5. Maintain awareness of the automation system control strategy and makes recommendations for continuous improvement;
6. Maintain awareness of plant operating costs considers costs regularly in the decision making process.
Qualification
Education: Diploma or Degree in engineering field preferable Mechanical, Electrical or Process. Possess at least one year working experience in a cement plant control room operation.
Technical Competencies /Additional skills:
• Mathematical Skills: Ability to calculate figures and amounts such as interest, proportions, percentages, area, circumference, and volume Chemistry and Physics As per CECIL + Prerequisites.
• Knowledge of Plant environmental regulations, safety rules and compliance including First Aid, Confined Space, Working at Height, Material hazard awareness system and LOTOTO.
• An understanding of manufacturing theory including air and material flows and control strategies for all major process lines associated with cement manufacturing: Quarry, Raw Grinding, Pyro Processing, and Finish grinding operations.
• Problem solving methods and tools (Root Cause Failure Analysis, Risk Analysis) Understanding of cause and effect relationships with other production tools.
Work Hours: 8
Experience in Months: 12
Level of Education: Associate Degree
Job application procedure
Applicants are invited to submit their Resumes and Cover letters via mcc.recruitments@lafarge.com indicating the position applied for in the subject of the email.
Deadline for application is 21st December 2023
All Jobs
Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.